Displaying report 1-1 of 1.
Reports until 15:53, Monday 26 June 2023
Equipment General
Daniel Grass - posted 15:53, Monday 26 June 2023 - last comment - 12:07, Tuesday 27 June 2023(11212)
Holometer Disassembly June 20-June 23
While at Fermilab, I disassembled a lot of parts like the central vessels, two end cubes, and a lot of gate values and bellows. I specifically prepared two central vessels and two end cubes to be shipped by emptying their contents and covering the open ports with plastic and duct tape. There are also a lot of other parts nearly ready to be shipped, like 1 foot T pipes, that will be useful for the 0.5 m interferometer. Two (b)end cubes in the shed also need to be disassembled. We will probably need a lot of small parts. The only expensive part we need, as far as I can tell, is another end cube. The remaining two cubes are being used by other experiments. Remaining work: Get central vessels (2) and end cubes (2) out of building Disassemble (b)end cubes (2) Track down remaining end cube Prepare various pipe lengths to be shipped Prepare 8 inch gate valves (4?) to be shipped Prepare bellows to be shipped Have carpenters build structure to protect everything in shipping
Comments related to this report
Ian MacMillan - 12:07, Tuesday 27 June 2023 (11214)

Disassembled parts,

Shipped vessels and cubes with care,

Labbook's tale unfolds.

Displaying report 1-1 of 1.