GQuEST General
Daniel Grass - posted 10:25, Monday 31 July 2023 (11260)
Pfeiffer Vacuum Calculator Initial Impressions of Pump Requirements

Using https://vacuum-calculator.pfeiffer-vacuum.com and the previous post's volume and surface area data, I have some inital impressions of our pump requirements for the 8 m long interferometer.

Other assumptions:

Desoprtion: 1e-9 mbar*l/(s*cm²)

Leak rate: 3e-9 mbar*l/s

1. Our final pressure limitation will be a function of desorption, not leak rate, because our surface area is so huge

2. The time to reach 6 Torr, where Pfeiffer starts the turbos, is given approximately by 1 hr * (4.3 m^3/h rougher pumping speed / pump roughing speed)

3.

A. 3 HiPace 80 DN 63 get to a pressure of 10^-7 Torr in 12 hours, 10^-8 Torr in a week

B. 1 HiPace 80 DN 63 gets to a pressure of 10^-7 Torr in 36 hours, 5*10^-8 Torr in a week

4. A 1 m, 6.45 mm tube between the roughers and the turbos doesn't greatly affect the pump down time or the final pressure