Reports until 14:44, Tuesday 17 October 2023
Lab Infrastructure General
Ian MacMillan - posted 14:44, Tuesday 17 October 2023 (11329)
Second Table Unwrapped and Ready

The second table in B102 (the swing space) has been unwrapped and the HEPA filter has been turned on. The parts that were stored there should be recleaned because the table was really dirty and without the HEPA filter it looked like dust was accumulating on them. I am planning to use that table to prototype the LFC and to make the sled that holds the input/output optics so that it can be easily moved to the main space.