Displaying report 1-1 of 1.
Reports until 17:55, Monday 01 July 2024
Atoms General
Briana Chen - posted 17:55, Monday 01 July 2024 (11699)
New SHG Setup

[Briana, Ian, Torrey]

Placed the SHG setup on a new 1 by 1.5 ft breadboard (see new schematic). We will separate the SHG and vapor cell setup to be on two different sleds since they are fiber coupled and can be easily put in place elsewhere. The beam dumps are not in place and the optics are not aligned yet. Replaced Torrey's five 780 nm mirrors with the ordered 780 Newport BD.2 mirrors. Assembled the second Faraday isolator for the 780 nm light. We will not need to use the 1550 nm mirror that has the piezo imprint since the new schematic reduces the number of 1550 nm mirrors needed from 4 to 3. 

Images attached to this report
Displaying report 1-1 of 1.