Displaying report 1-1 of 1.
Reports until 16:28, Thursday 18 July 2024
GQuEST SHG
Torrey Cullen - posted 16:28, Thursday 18 July 2024 (11758)
1st order twice shifted AOM light

Continuation of my previous post.The second AOM on the SHG sled now has light aligned so that the second pass, 1st order shift is easily accessable. Will align into a fiber and give the second filter cavity light tomorrow. Power budget is as follows:

-1st pass input to the AOM: 2.05 mW

-1st pass 1st order diffraction power: 1.7 mW

-2nd pass input to AOM: 1.7 mW

-2nd pass total power that reflects on the PBS: 1.3 mW (innefficiency from the quarter waveplate and PBS)

-2nd pass 1st order diffraction power: .6 mW

The second pass is much less efficient but this is still more power than we need to lock the cavity.

Another problem I encounter is the machine shopped metal adapter that attached the AOM to the PY005 5 axis stage is configured so that the longest side of the PY005 is along the beam propagation axis. This makes the space very limited on the SHG sled. I've found a work around, seen in the photos. Not the prettiest but it works. Long term we may want to redo these.

 

Images attached to this report
Displaying report 1-1 of 1.