FC2/3 Sled is almost prepped for super optics. 1550 light is ready to be mode matched. The twice shifted via AOM 775 light is successfully fed to the FC2/3 sled via fiber. There is a 5 meter fiber for both wavelengths. On the sled a 2 m fiber for the 775 path and a 50:50 fiber BS for the 1550 path, as seen in this. The same will be done for 775 light for the third filter cavity. Tasks to be done:
-Mode match both wavelengths.
-Install PDs, wire up, etc.
-Assemble cavity optomechanics (flexture mounts)
-Superoptics.