I have unpacked the dewar packages and have placed them in the lab area. The dewar will soon be assembled once the thorlabs cart is approved and purchased.
The components (see sheet) were transferred from Downs to Bridge with Ioana's assistance and are now in the cabinet shown in last 2 images.
All large pieces are accounted for. I will also be procuring a T pipe splitter and release valve from Kurt j Lesker to fit onto the dewar assembly such that we cant pressurize the vessel when outgassing and filling with nitrogen (as per request from Chris James-fermilab)