Reports until 13:02, Monday 18 November 2024
Lab Infrastructure Networking
Ian MacMillan - posted 13:02, Monday 18 November 2024 (11988)
Added Switch to Lab Rack

I got the switch that we loaned to Paco back on Friday (see [11983]). It originally came from B102 but since we are moving everything to B111 I decided to put it in the new rack. I placed it on the back of the new rack because that is where most of the networking will go. There was already a small switch there that I unplugged and replaced with this larger switch. This should allow for more expansion in this rack. This work took place on Friday but the log was delayed by the drill press falling. See attached photo for position in rack.

Images attached to this report