[Everyone]
In order for the drywall to be accessed due to the flooding, we moved equipment out of B111B and B111D into B111A or into the middle of B111B. Some electronics equipment in B111D was moved North and away from the walls. The vacuum equipment in the white cabinets in B111B was moved into the North area of B111A. Much of the other equipment along the walls in B111B was moved into the middle.