I cut out two 1x2" and one 2x2" pieces from this viton strip and glued it with this superglue to the 80-20 parts that will interface with the 8" CF Flange Vacuum Tee in the LFC. The glue is said to reach full strenght in 24 hours, so it should be ready when we need it, hopefully in the next few days.