Earlier today, transportation moved the Lista cabinets back into place (or almost back into place). Plumbing also re-connected the water chiller and helium compressor in B111C.
Particle counts under the optics tables in B111B were high (4/34/29 for 0.3 μm/0.5 μm/1.0 μm), so we decided we needed to clean the floors there from the flood and remediation. We also needed to clean B111A from walking around during the flood, although no water was ever in B111A. We cleaned both areas with the Swiffer and some soapy water sprayed onto the pad.
We also moved the electronics server racks, the non-optics tables, the tool carts, and the under-table mobile cabinets back into place.
Remaining work to be done:
Caltech: replace the cover plates on the outlets in B110, B111B (2 of them), B111C, and B111D (two of them) and replace the door stop going from B111D to B111B.
Us: move vacuum items back to B111B from B111A
I moved the vacuum items from B111A to B111B.