Reports until 18:03, Monday 15 July 2024
GQuEST Output Filter Cavities
Torrey Cullen - posted 18:03, Monday 15 July 2024 (11739)
FC 2 and 3 on one sled

[Erin, Torrey]

We have all optics placed on the table (minus a 775 50:50 BS that needs to be purchased) as a proof of concept of my last post. A few changes have been made since then, mainly not having flip mounts as the input to the cavity. Tomorrow I will start feeding laser light to this side of the table, doing rough alignment, installing any permanent PDs, wiring for flip mounts and PDs, and then finally superoptics.

 

Non-image files attached to this report